House Construction Contract Agreement Philippines

4. That the CONTRACTOR must pay a fine equal to 1% of the contract price for each day of turnover delay. 3. That the CONTRACTOR complete and surround the coffee in question at the contract price and in accordance with plans and specifications 2. To ensure the necessary building permits, the CONTRACTOR is responsible for the purchase of equipment, recruitment, coordination with the architect and the owner with regard to the details of the construction and the approval of the materials. 7. That the owner agree to pay 30% of the contract price at least 5 working days before the scheduled start date in the form of a down payment and the 70% balance payable in identical weekly payments based on the signing date until the expected end of the project. If necessary, additional costs must be borne as needed. 1. That the CONTRACTOR agree to renovate and renovate ABC COFFEE SHOP at the price of the pesos contract: 000,000.00 (amount in words). 5. Work begins on January 1, 20.

Shelves, cabinet doors, laminates and other surface details: according to specifications, What WE, (name of the contractor), of a major age, single/married, a resident of (the address), the following referred to as contractor and (owner`s name), of legal age, single/married, a resident (address) and named owner, you herein agree and indicate: Install high density polypropylene (PP-R) These 10% of payments paid to the CONTRACTOR will be kept by the owner. Install a polyvinyl tube (PVC) for sewers and waste pipes with solvent cement maker (ASTM D2564) CE PROTOCOLE, made this 8th day of January 2015, between SOUTHERN PHILIPPINES MEDICAL CENTER, with office address in Bajada, J.P. Laurel, Davao City (cemented cemented) and RIEZL LANDCARE – CONSTRUCTION, with main address. Wilfredo Aquino, Agdao District, Davao City (`CONTRACTOR`). Waterproof to all wetlands with Hygard, Thoroseal or approved Equivalent contract name: DESIGN AND BUILD OF RENOVATION AND UPGRADING OF NEURO-WARD Install 12 x 12 Mariwasa ceramic tiles (Montalban Beige – Red). The Republic of the Philippines HEALTH HEALTH Center Davao Regionsouthern Philippines MEDICAL CENTERJ.P. Laurel Avenue. Davao City Use plaster cardboard as a ceiling, finished with a seal and followed by two semi-bright enamels with finished layout and install electrical wires, cables, boxes, circuit breakers, comfort outlets and electrical provision for WHEREAS devices, signs and telephone cables, ENTITY is the wish that the CONTRACTOR EXECTUE DESIGN AND BUILD OF RENOVATION AND UPGRADING OF NEURO-WARD (here called “works” and ENTITY has the offer for twelve million nine hundred six hundred six hundred six hundred thirty-two pesos and ninety-seven centavos (Php 12,906,632.87) of the CONTRACTOR for the elimination of these 9. That the withholding guarantee be released no later than two (2) weeks after the owner`s acceptance of the renovation carried out. IN WITNESS, whose parties executed this agreement on the day and year before writing. .

Manufacturing and assembly of plywood counters with 12mm solid material.